First Phosphate update expands EV battery ingredient fourfold in Quebec
Mining.com
Read Full Article at Mining.com →
Ad Slot — In-Article (728x90)
The update outlines 6. 2 million measured pit-constrained tonnes grading 7. 7% phosphate and 198. 5 million indicated tonnes at 6%.
This is a summary. For the full story, read the original article at Mining.com.
Original source: Mining.com