Ottawa’s C$500M Red Chris bet tests British Columbia grid
Mining.com
Read Full Article at Mining.com →
Ad Slot — In-Article (728x90)
Red Chris would need up to 145 MW from planned Northwest Transmission Line upgrades to support the Block Cave expansion.
This is a summary. For the full story, read the original article at Mining.com.
Original source: Mining.com