Séguéla revamp sets up decade of 200,000‑oz production
Mining.com
Read Full Article at Mining.com →Ad Slot — In-Article (728x90)
Processing capacity will rise 30%, from 1. 75M to 2. 3M tonnes, boosting average gold recovery to 94. 5%.
This is a summary. For the full story, read the original article at Mining.com.
Original source: Mining.com